Welcome Sign in
Lab Pua Twin Header series Sediment with Carbon Block with Polyphospate
Warning: Last items in stock!
Availability date:
Service Flow Rate |
2.1GPM (7.94L/min) |
Rated Capacity |
6 Months |
Operation Temperature |
4~38℃ (39~100℉) |
Pressure Requirements |
10~100 psi (0.7~6.9bar) |
Inlet / Outlet Connection |
3/8″ |
Electrical Connection |
None required |
Dimension |
Overall : 3.7″*18.8″ Cartridge : Ø3.3″*17.4″ |
Weight |
0.7kg |
Claim |
Particle, Dust and Sand, etc |
• Pretreatment filtration (PP, Melt Blown Type)
• Can remove up to 5micron particles through mechanical method.
• Replacement method is very simple, quick and clean.
Service Flow Rate |
2.1GPM (7.94L/min) |
Rated Capacity |
21,000 Gallon (79,484L) |
Operation Temperature |
4~38℃ (39~100℉) |
Pressure Requirements |
10~100 psi (0.7~6.9bar) |
Inlet / Outlet Connection |
3/8″ |
Electrical Connection |
None required |
Dimension |
Overall : 3.7″*18.8″ Cartridge : Ø3.3″*17.4″ |
Weight |
1.1kg |
Claim |
Chlorine, Taste and Odor, Particulate, Scale Inhibitor |
• Phosphate can prevent to make scale in boiler or heater (phosphate)
• 5micron pore size CTO Block
• Extrusion carbon production method provides stable quality and
• Pre-shield Technology can prevent early clogging and keep the lifespan.
• Replacement method is easy quick-change.
1. Turn off main tap water.
2. Rotate the old cartridge counter clockwise ¼ turn and pull it out.
3. Insert the new cartridge into the filter head and rotate clockwise 1/4 turn.
4. Please the cartridge to the vertical position.
5. Turn on the main tap water and check for leaks. If leaks occurs, repeat step 1, 2, 3,4. If leaks persist, discontinue use and call your supporting dealer.
6. Flush filter for 10minutes before use.
1. For cold water only.
2. Filter should be replaced by each required replacement date.
3. The testing was performed under standard laboratory conditions, actual performance may very.
4. Check for compliance with the state and local laws and regulations.
5. System must be installed and operated in accordance with manufacturer’s recommended procedures and guidelines.
6. Be sure to use the pressure reducing valve, If the water pressure exceeds 4bar.